Diary of work performed by the Electricians of the H.K.V.E. during Camp, 1905.
TIME.
DATE.
From
To
7905.
1th Oct., 6.00 pm.
SUBJECTS.
7.00 p.m. Tracing connection on switchboard,
16th
6.00
7.00
35
T
16th
5.30
6.30
*
17th
>
17th
"
5.30 p.m.
7.00
17th
8.00
9.30
Dynamo attendance.
Incandescent lighting of Defence buildings.
10.00 am. |11.30 am. Tracing E. L. connections, preparing and fitting
brushes to dynamos.
Fixing up projectors for working outside No. 19
Emplacement.
Working temporary projector as searchlight, and at same time Camp lights, all from 19 dynamo, No. 20 engine heing out of action. 7:30 aan. Lecture-Construction of dyname.
Working Nos. 19 and 20 dynamOS.
Installing tenis with incandescent humps,
Lecture-E. L. instruments and tools.
REMARKS.
The Camp was il- Juminared from Nos. 19 and 20 Engine Room during the whole period, by the Volunteers, equi- valent of 150 16- c.p. lamps were installed.
vernor.
No.
han 173
1906
28
June
previous Paper.
9541
No.
NG KONG
No. 27859
27859
[RECP
IRES 30 JUL 06.
(Subject.)
Survey of Victoria Harbour
Seeds copies of charts thouring text
Rections taken.
Y
differences in level,
No further action is proposed at present
18th
6.00 a.m.
18tb
8.00
9.30
*
198
10.00
11.30
•
25
1kr
4.45 1.
20th
10.00 aan.
6.00 pan.
12 No n.
Fitting tents with incandescent lights.
201
: 5.30 p.m.
6.30 p.m.
218t
6.00 am.
7.30 a.m.
21st
10.00
11.45
35
:*
22nd
10,00
11.30
13
23rd
6.00
7.30
52
24th
6.00
7.80
**
*
24th
6.30 p.m.
25th
25th
10.00
"
25th
21
5.30 p.m.
*.00
26th
6.00 aun.
p.m.
8.00 a.m.
26th
10.00
12 Noon.
7)
**
26th
3.30 p.m.
7.00 p.m.
27th
7.00 a.m.
7.00 aan.
9.00 pm.
Working Nos, 12, 13 and 14 lights.
Working Nos. 19 and 20 lights from No. 20 dynamo.
Tracing cross faults in No. 19 eirenits.
Lecture- Ohms laws" to E... work.
Lecture Are carbons, reflectors.
Lecture-Reflectors, lenses.
Mamming Nos. 12, 13, 14, 19 and 20 lights.
8.00 a.m.; Lecture-Beams, focussing, fixing, and directing.
12 Noon. Finding polarity of dynatos, in changing carbons.
Dismantling and re-fixing a mark II projector.
Visit to and explanation of a service Directing Station
and Telephone Room, R.E. Comunicatious. Connecting up and working No. 19 temporary pro-
jeetor.
Working Nos. 12, 13, 19 and 20 lights,
8,00 n.m. Lecture-Are Carbons,
27th
10.00
35
12 Noon.
Adjustments and working of automatic lamps.
!!
27th
5.30 p.m.
7.00 p.m.
Working Nos. 12, 13 and 20 lights.
28th
6.00 a.m.
7.80 a.m.
Lecture-Antomatic lammps, lenses, and reffectors,
28th
2.30 pm.
Bist
5.30 p.m. Technical Inspection by O.C. Submarine Mining,
0.00 a.m. 10.00 a.m. | Dismantling incandescent fitting in lamps.
—30191-252-1900)-11-0
ubsequent Paper.
hir Fiddes
(Minutes.)
Hr. docent purpose
at
present
ملا
to do ay
any thing
? Sound 40903/05 to of
for ax
to c.a. for
ke.9.
RU
G18.
No comments yet.
Private notes are available after approval.